FOB Price
Get Latest Price8 ~ 30 / Unit
|- Minimum Order
Country:
China
Model No:
-
FOB Price:
8 ~ 30 / Unit Get Latest Price
Place of Origin:
-
Price for Minimum Order:
8 per Unit
Minimum Order Quantity:
-
Packaging Detail:
In bundle
Delivery Time:
20 days
Supplying Ability:
1000 Unit per Day
Payment Type:
Western Union, L/C, T/T
Product Group :
Contact Person Mr. Honway
Hustpark, Development zone, Xingtai, Hebei
scaffolding prop,steel prop,shoring prop,post shore
Specifications:
Working height range: 1.5m*3.0m, 2.0m*3.5m, 2.2m*4.0m, 3.0m*5.5m
Inner tube dia(mm): *0/*8/*0
Outer tube dia(mm): *8/*6/*0/*5
Wall thickness: from 1.6mm to 4.0mm
Surface finished: painted / powder coated / galvanized
Special requirment available upon request.
Can match well with Doka and Peri formwork systems.
Xingtai Horizon Formwork Co., Ltd., the manufacture of formwork system, formwork accessories and scaffolding parts. We supply: wall formwork, slab formwork, steel prop, jack base, wing nut, tie rod, water stop, washer plate, formwork clamp, plate anchor etc.
Pls contact us on hw**2 at hotmail dot com
Country: | China |
Model No: | - |
FOB Price: | 8 ~ 30 / Unit Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 8 per Unit |
Minimum Order Quantity: | - |
Packaging Detail: | In bundle |
Delivery Time: | 20 days |
Supplying Ability: | 1000 Unit per Day |
Payment Type: | Western Union, L/C, T/T |
Product Group : | Shoring system |